The Low-Carbon House:
Prescriptive Energy Standards:
Level 4 / Carbon Lite 'Silver'
• The following standards correspond to:
- Code for Sustainable Homes Level 4
- AECB Carbon Lite programme Step 1/Silver
Key features
• Good levels of insulation.
• Minimal thermal bridges.
• Good level of airtightness.
• Effective orientation for winter solar gains and summer cooling.
• Mechanical exhaust-only ventilation or ventilation with heat
recovery.
• Heating normally from lowpowered gas, oil or LPG fired condensing
boiler.
• Lighting by compact fluorescent lamps or similar.
• Electrical appliances normally A+ rated or better.
• A guidebook to explain to users how/why the building differs
from many others and how to operate it.
Introduction
This page sets out the details of the prescriptive standards applying to Level 4 of the Code for Sustainable Homes. They explain as far as possible what measures designers and others must implement in order to comply with the standards. In most countries where advanced energy standards have been tried, designers have wanted some kind of prescriptive standard. It provides them with relatively clear guidance and assurance as to what is likely to be acceptable. By avoiding or reducing the need for calculations, it may also reduce the risk of errors.
NB Designers must use the performance version of the standards if any parameters; e.g., the ratio of glazed area to floor area, the orientation, the ratio of glazing area to total window area, etc, are outside the range listed.
Designers are free to use the performance version if they feel their proposal is superior to the requirements listed here. The values listed here represent typical cases of careful design, but they are often not the best possible. For instance, it is feasible to design fenestration whose area is more than 70% glass and less than 30% frame. It is also feasible to design buildings whose unobstructed south-facing glazed area exceeds 10% of floor area.
Design fundamentals
• Design all buildings so that daylighting can displace substantial amounts of electric light.
• Set aside an area of south wall or roof to retrofit solar thermal or photovoltaic panels if ever needed.
• Provide space to retrofit solar tank if not fitted now.
U- values(including y-values ) if following UK conventions3
• The elemental U-values must be met by all elements which separate
a heated volume from an unheated space; e.g., from a porch, a cold cellar
or an attached garage, or which separate it from the outside air. The
U-values of elements which are adjacent to such spaces may not be increased.
• The limiting U-value for floors includes not just ground floors.
Floors above unheated spaces; e.g., some stairwells in blocks of flats,
or floors above the open air, are also covered by this requirement.
Sum of U- value plus y-value 4 |
W/m2K |
| Roofs | ≤ 0.15 5 |
| External walls | ≤ 0.25 |
| Floor | ≤ 0.20 |
| External opaque doors, uninstalled 6 | ≤ 1.0 |
| Windows, uninstalled 7 | ≤ 1.40 |
| Rooflights, uninstalled 8 | ≤ 1.7 |
| Separating walls in terraces and semi-detatched houses 9 | ≤ 0.5 |
OR
U- and Ψ-values if following PHI conventions 10
U- value element |
W/m2K |
|
| Roofs | ≤ 0.15 | |
| External walls | ≤ 0.25 | |
| Floor | ≤ 0.20 | |
| External opaque doors 6 | ≤ 1.0 | |
| Whole windows | Uninstalled | ≤ 1.40 |
| Whole windows | Installed | ≤ 1.50 |
| Rooflights | Uninstalled | ≤ 1.70 |
| Rooflights | Installed | ≤ 1.80 |
| Separating walls in semi-detatched houses and row houses 9 | ≤ 0.50 | |
| Ψ-values element | W/mK | |
| Around window/door openings | ≤ 0.03 | |
| All other | ≤ 0.01 | |
Air leakage and ventilation
| Air leakage per unit of thermal envelope area under pressure11 | ≤ 3.0 m3/m2hr @ 50Pa for
whole-building mechanical exhaust ventilation. (MEV), ≤1.5 for balanced mechanical ventilation with heat recovery (MVHR). |
| Ventilation 12 | MVHR or MEV. Specific fanpower ≤0.8 W per l/s (MEV) or 1.5 W per l/s (MVHR). Seasonal heat recovery ≥75% excl. fans. |
Heat loss parameter
(HLP) in W/K.m2 floor area as a function of building thermal capacity in kWh/K.m2 13
| HLP W/K.m2 | Building thermal capacity kWh/K.m2 |
| 30 | ≤ 0.96 |
| 50 | ≤ 0.99 |
| 100 | ≤ 1.03 |
| 200 | ≤ 1.04 |
Windows and glazing
| Window solar energy transmittance, incl. frames 14 | ≥ 35% |
| Window visible light transmittance incl. frames 15 | ≥ 50% |
| Window area to floor area ratio incl frames | 18 – 30% |
| Ratio of unobstructed south glazing area, excl. frames to floor area, domestic 16 | ≥ 10% |
| Ratio of glazing, excluding frames to wall area 17 | ≤ 30% |
| Protection against overheating 18 | Design to avoid overheating in winter and summer by passive means. Refrigerative cooling systems or reversible heat pumps are not permitted. |
Space and water heating
| Space heating system 19 | Normally radiators or underfloor pipes. Fed from SEDBUK
A-rated mains gas condensing boiler, CHP or, outside the gas supply
area, SEDBUK A-rated LPG or oil condensing boiler, earth-source heat
pump (seasonal COP ≥3.0) or cleanburning biomass boiler; i.e,
one using liquidor gaseous fuels. Wood pellet boilers are permitted
outside the gas supply area but are not encouraged due to the exhaust
emissions. Blocks of flats or maisonettes to have a central boiler and/or CHP plant or heat mains connection; i.e. heat distribution within the block rather than individual boilers or electric heating. |
| Water heating system | Same as space heating system; plumbing to be as compact as possible. |
| Hot water system insulation 20 | Tanks ≤ 100 mm PU foam(λ=0.024 W/mK) or equiv., pipes and valves ≥ 30 mm mineral fibre (λ=0.04 W/mK) or equivalent and cold pipes to have a vapour barrier. |
| Cooking 21 | No requirement for gas ovens, electric ovens to be A. |
Daylight and lighting
| Daylight factor | All habitable rooms to have a glazing area excl. frames ≥14% of floor area. |
| Lighting 22 | Electronically-ballasted CFLs, T5 or T8 everywhere bar cupboards.
All table, desk and floor lamps to have CFLs or equiv. LEDs acceptable
if/when their efficacy reaches that of CFLs. Weighted average lamp and luminaire efficiency sufficient to give ≥45 lm/circuit W; e.g., a combination of 75 lm/W lamps and 60% efficient luminaires. |
Appliances
| 'Cold' electrical appliances 23 | Minimum A+ |
| 'Wet' electrical appliances | The top 50% of A class. |
| Clothes dryers | Gas, LPG or heat pump or integrated with MVHR or MEV system. Last two arrangements usually need condensate drain. |
| TVs 24 | Screens to be LCD or CRT. If LCD, choose from all models on www.topten.ch. If CRT, choose any model with an electricity consumption equal to or lower than these LCD models. |
| Lifts 26 | Energy-efficient models. |
| Small electrical appliances 27 | No requirement |
Renewable electricity
| On-site or dedicated renewable electricity generation | No requirement |
Embodied energy
| Embodied energy 29 | No requirement |
Monitoring
| Monitoring |
Maintenance and commissioning
| Maintenance and commissioning 30 |
Post-occupancy survey
| Post-occupancy survey 31 |
Notes
1 Pre-approved combinations will be issued
by the CarbonLite Programme later in its schedule which are deemed to
satisfy the requirement of the standard for different types of small
building; e.g., detached bungalows, semi-detached houses and flats,
without the designer doing any significant further calculations.
If the requirements for a particular parameter are not stated here,
they are the same as the minimum in the Building Regulations for that
region or country; e.g., Scotland, Northern Ireland, the Isle of Man,
Jersey and the other Channel Islands, England and Wales.
If a designer proposes dwelling(s) with integral garage(s), the opaque
thermal envelopes of both the dwelling and the integral garage must
meet the above thermal insulation and thermal bridging requirements.
This is to ensure that any future conversion to residential use does
not materially worsen the thermal performance of the building.
In such cases, the air permeability of the garage and the U-values of
its windows and doors are not regulated. It is assumed that these would
and could be remedied during any future residential conversion.
Attached garages are exempt from this requirement. So clearly are detached
garages. Both layouts are actually preferable if a garage is needed.
This is because exhaust fumes are less likely to enter the dwelling
and because the dwelling itself remains simpler in shape, giving a thermal
envelope with a smaller area and with fewer non-repeating thermal bridges.
3 The elemental U-values must be met by
all elements which separate a heated volume from an unheated space;
e.g., from a porch, a cold cellar or an attached garage, or which separate
it from the outside air. The U-values of elements which are adjacent
to such spaces may not be increased.
The limiting U-value for floors includes not just ground floors. Floors
above unheated spaces; e.g., some stairwells in blocks of flats, or
floors above the open air, are also covered by this requirement..
4 Under UK conventions, the elemental U-value includes all repeating thermal bridges and the y-value is a correction which is applied to elemental U-values to account for the impacts of nonrepeating point and linear thermal bridges. Conventionally, y = +0.08 W/m2K if one is using accredited details. The y-value is in effect spread uniformly over the whole area of the building, although in reality the thermal bridges are usually concentrated in certain areas of the building.
y can be further reduced by using details which are specifically designed to limit thermal bridging.
5 Opaque U-values listed are maxima. To
meet the other limits; e.g., the heat loss parameter, most buildings
with a high surface area-to-volume ratio; e.g., small or medium-sized
detached houses, and some semi-detached houses, will need to utilise
lower opaque Uvalues. In buildings such as flats, offices or compact
row houses these U-values generally suffice.
The heat loss parameter (HLP) must be calculated using the ventilation
rate for the design occupancy level; e.g. 2.56 people in a 80 m2 semi-detached
house, pro rata for dwellings of other sizes. One must use effective
U-values for the ground floors which include the impact of heat transfer
via the soil.
6 Most suppliers of certified Passivhaus windows can also supply thick insulated external doors, with a whole-door U-value of around 0.6 W/m2K. After correcting for the thermal bridging due to the installation detail, the effective heat loss is higher. If one is following PHPP conventions, the installed U-value is limited to 1.05 W/m2K for Level 4/ Silver and 0.65 W/m2K for Level 5 / Passivhaus or Level 6/ Gold. There are many suppliers of external doors with a U-value of ≤1.0 W/m2K - usually North American or Scandinavian imports.
7 Broadly speaking, a window U-value of
1.4 W/m2K, or 1.5 W/m2K including the thermal bridge due to the installation
detail, can be reached by:
a) low-e argon-filled double glazing (warm edge; e.g. Thermix, Superspacer,
Swisspacer) in wood or GRP frames; or
b) low-e air- or argon-filled triple glazing (cold edge) in wood or
GRP frames, plus window installation details which exclude the use of
significant amounts of steel, other metals, concrete or dense masonry
and exclude the use of excessive amounts of solid timber in the plane
of the window. See CLP - Silver Standard Design Guidance.
Manufacturers normally quote U-values for a single-light window measuring 1230x1480 mm. Certified Passivhaus windows have U ≤ 0.8 W/m2K for a window of this size. A window U-value of 0.8 W/m2K, or 0.85 W/m2K including the installation detail, normally requires triple glazing with krypton or argon gas fill, two low-e coatings, warm edge spacers and insulated GRP, plastic or wood frames.
As of 2007, there are over 45 relevant products from at least seven countries, namely Finland, Sweden, Norway, Germany, Austria, Switzerland and Canada. Most are inward-opening, tilt-andturn; the Canadian windows are outwardopening, top-hung. In addition, suitable window installation details are needed, as for Silver.
The total glazing area in the building must be ≥70% of the total window area. The frame and sash area combined must be ≤30% of the total window area. Measure the frame and sash area from the edge of the glass to the edge of the structural opening – or as far as the edge of the wall insulation, if this overlaps the frame when viewed in elevation. If these criteria are not met by the proposed building, use the performance version of the standard.
By following the above rules, it is expected that the U-value for the actual mix of windows installed in a building, including the installation thermal bridge, can normally be kept to ≤0.85 W/m2K. If experience shows that this limit is not being met, AECB will modify this guidance.
8 A few mass-produced rooflights could possibly meet the Silver standard. A few could possibly meet Silver. Some site-built sloping glazing systems could meet Silver.
European manufacturers' stated U-values for manufactured rooflights are usually the U-value of the glazing alone, or the glazing and frame alone, installed in a vertical configuration. This gives an inaccurate picture of the overall U-value which the glazing will achieve in a sloping position and with extensive thermal bridging at the rooflight kerb.
The 2005 ASHRAE Handbook of Fundamentals, pp. 31.8-32.9 has realistic but indicative U-values for sloping glass systems, using all the main generic glazing and frame types. Until further notice, most designers who want to use sloping glazing should follow the performance version of the standard and use the above U-values as guidance in the early stages, replaced by fully-calculated U-values and Ψ-values as a project progresses.
Such designers need to provide adequate winter heating system capacity below such rooflights, to combat downdraughts. They may wish to slope rooflights to the north, to reduce the potentially overwhelming summer heat gains. When more rooflights meeting the prescriptive standards become available, designers can more easily use the prescriptive version.
9 Separating walls are walls between separate dwelling units, or between rental units in some non-domestic buildings. They are often called party walls. Such walls must be sufficiently insulated that an attached dwelling or other building can still be heated if adjacent dwelling(s), or other building(s), is/are unoccupied for a prolonged period. Designers can relax these U-values by up to 10% if they wish, but they remain responsible for the satisfactory performance of the resulting dwelling(s). This may require larger heating systems.
In cases where; e.g., a row of houses is stepped down a hill, a separating wall may become an external wall near roof level and may again become an external wall below ground level. The top of such a wall must meet the upper limit to external wall U-value. The base of such a wall must meet the upper limit to wall U-value, taking into account the effect of the earth contact..
10 The U-value calculated by PHI using PHPP includes the same components as in the UK, but the elemental areas are measured with reference to external dimensions. Using these conventions, all thermal bridges whose Ψ-value is ≤0.01 W/mK with reference to external dimensions may be omitted.
The PHI procedure overestimates heat loss. With good detailing, most £r-values are negative when they are expressed with reference to external dimensions.
If they wish, designers who use external areas may add up the Ψ-value of all the individual thermal bridges. This is considerably more work. However, because the Ψ-value of the thermal bridges are negative, it permits them to use slightly thinner insulation and there may be a sufficient cost saving on large projects to justify the extra design work.
11 The Passivhaus Standard requires air leakage of ≤0.6 ac/h at 50 Pa. The UK limit is expressed as an air permeability in the same units as UK Building Regulations; i.e., in m3/m2hr at 50 Pa. By regulating air permeability rather than air leakage, the thermal envelopes of all buildings have to be designed to be equally airtight and anomalies are reduced.
Note, UK air permeabilities for attached dwellings are calculated by dividing the total airflow by an "envelope area" including the separating walls and floors, not just the external elements. This convention can give misleading results. If the separating walls and/or floors are fairly airtight, as they must be for acoustic insulation, using this approach has the effect of increasing the permitted total air movement through unit area of thermal envelope at 50 Pa. AECB requires designers to divide total airflow by thermal envelope area (based on internal areas). For detached houses, there is no ambiguity; the total surface area equals the thermal envelope area.
To reach the Silver Standard permeability of ≤3.0 or ≤1.5 m3/m2hr at 50 Pa under UK conditions is moderately easy if a design and building team have understood the principles and gained experience, from the testing of real buildings. The transition will be smoother if they adopt plastered masonry construction with concrete intermediate floors, as used on mainland Europe; timber-frame construction with Canadian-type airtight construction details of the last 30 years, as used in the R- 2000 Program; or most forms of concrete construction.
New German and Swiss buildings tend to meet this level of airtightness without extraordinary efforts, so long as windows and external doors are of good quality and incoming services are sealed. These buildings are customarily constructed from plastered load-bearing masonry with in situ or precast concrete intermediate floors.
Construction details which are used for airtightness must be designed to stay airtight over time. Some UK buildings which have been re-tested became 30-50% leakier over the space of just 3-4 years. Some timber-frame houses which were constructed in the Orkney Islands in 1993 became three times leakier over 4 years.
We know with some confidence what is likely to be adequate in timber-frame construction, because Canada has published design guidance in this field for 30 years. It no longer recommends some of the airtight construction details which were published in the late 1970s. Similarly Sweden. The procedures which have worked best are where a heavy-duty membrane is used as an air barrier, it is sealed at seams and the seams are all clamped between two solid materials.
Owing to wind pressures, even the Canadian approach of a heavy-duty, protected, sealed and clamped membrane is not today considered adequate in buildings of more than four storeys. So these buildings need to use other materials/systems in order to produce a durable air barrier.
Many continental European countries have experience with solid masonry, concrete-floored construction. Airtightness is easier to achieve here; solid "all-wet" construction is relatively tight if the plaster layer is continuous and if in situ concrete floors, which continue the air barrier between floors, are used. But great care is still needed at all services openings, window and door openings, joints between precast concrete elements and joints of masonry and pre-cast concrete.
Timber roofs in masonry and concrete buildings need sealing as described for timber buildings. Masonry or concrete elements which crack will leak. Cracking must be prevented by measures such as sealed movement joints and/or bed-joint reinforcement.
Separating walls between attached dwellings must be designed to be airtight and designed to avoid other heat loss mechanisms; e.g., convective bypasses. In other words, assuming that adjacent buildings are at the same temperature, the measured heat loss of the separating wall must be zero. Most separating walls built today comply with Part E but do not meet the requirements of good thermal envelope design, which is an implicit requirement of Part L. This leads to elevated heat loss.
Separating floors within blocks of flats or maisonettes must also be airtight and must be designed to avoid unwanted heat loss mechanisms. Convective by-passes are a risk in hollow-core precast concrete floors, unless precautions are taken.
12 Silver Standard ventilation in blocks of flats or row houses, with a low surface/volume ratio, could sometimes be met by whole-house MEV and still meet the requisite heat loss parameter. MEV costs less than MVHR and may use little more primary energy, especially if buildings meet a permeability of 3 m/hr. It has been and is widely-used in Sweden.
The Silver Standard does not at present permit passive stack ventilation (PSV), because PSV does not appear capable of providing fresh air with the same precision as well-designed and well-maintained MEV or MVHR systems. However, this policy will be kept under review and will be informed by results from adequately-monitored case studies.
13 The heat loss parameter (HLP) is the
building's specific heat loss divided by the building's floor area,
measured internally. If buildings are following the prescriptive standards,
they must meet both the heat loss parameter and the elemental Uvalues.
The limit to HLP varies slightly with building thermal capacity. The
variation listed is based on results of PHPP simulations, a tool which
is itself calibrated using the results of earlier dynamic thermal simulations.
All values relate to a building whose south-facing glazing area, excluding
frames, equals 10% of floor area. Caution is advised for lightweight
buildings; see note 16.
Lighweight: a thermal capacity of 30 Wh/Km2 is typical of timber-frame
or SIP buildings whose thermal capacity is limited to the plasterboard
or timber panelling and the building contents. 50 is typical of such
buildings if they are modified by; e.g., using double plasterboard throughout
and/or a thin ceramic tile finish on much of the floor area.
Intermediate: 100 is typical of single-storey timber structures with a concrete ground floor, insulated below the slab.
Heavyweight: 200 is typical of buildings with dense masonry external walls, pre-cast concrete intermediate floors, lightweight partitions and timber roofs. 400 can be reached or exceeded by buildings with dense masonry or concrete external walls, in situ concrete intermediate floors, dense masonry partitions and concrete roofs.
Interpolate linearly for intermediate amounts of thermal capacity. If in doubt, meet the lower HLP of the two alternatives.
Buildings with higher HLPs are not ruled out. Very high-capacity south-facing buildings, including earth-sheltered buildings, may use very little space heating energy, despite a slightly higher HLP than the ranges given in the prescriptive standards. However, they must be justified using the performance version of the standard..
14 The g-value or total solar energy transmittance is a weighted average for all the windows and glazed doors in the proposed building, including frames plus glazing. The g-value of the glazing of most Silver Standard windows is 60-65%. Buildings which use lower g-values must follow the performance version of the standards.
15 Visible light transmittance is important
to daylighting in all building types. The limit is
a weighted average and applies to the whole window, including sashes,
frames and
couplings between windows in curtain walling-type systems. Measure window
sizes
to the outside of the structural openings.
16 Includes only buildings whose principal, most highly-glazed façade is within 30° of due south and is shaded by no more than the equivalent of a continuous row of houses 7 m high, located 40 m to the south and on flat ground. Anyone who needs to exceed these glazing ratios or has to deal with worse overshading must do their own calculations and use the performance version of the standards.
For thermally very lightweight buildings; e.g, timber-frame or SIPs with no more thermal storage than the plasterboard lining alone and the building contents, proceed with caution until AECB issues more detailed guidance. If in doubt, use slightly less unshaded south-facing glass than 10%.
For all construction types, reduce the HLP by 0.015 per percentage point by which the ratio of unshaded south-facing glazing area, excluding frame, to floor area falls below 10%. So for a ratio of 8%, reduce the HLP by 0.03; for a ratio of 5%, reduce it by 0.075.
In a passive solar context, south means the principal façade of the building. Depending on the individual circumstances, it may face due south or within 30° of south.
17 This limit is significant for reducing the risk of summer overheating but is usually only approached on flats or large non-domestic buildings. Anyone who wishes to exceed the ratio must do their own calculations and follow the performance version of the standards.
18 Overheating falls into two different
categories:
a) Summer overheating even when windows are open, due to prolonged heatwave
conditions plus solar gains and/or internal gains, and;
b) Late winter overheating, usually in February or March whenwindows
are closed. Accentuated by large areas of south-facing glazing and low-angle
sunshine overwhelming a lightweight building's thermal mass. Rarely
recorded in the UK, due to high heat loss, overshading and the low number
of entirely lightweight buildings, but often observed in the past in
the USA, Canada, Norway and Sweden.
Summer overheating is accentuated by large areas of unshaded west- or
eastfacing glazing. The sun's rays in the morning and afternoon are
incident at a low angle and are hard to block by external shading. Do
not use large areas of east or west glass unless effective shading can
be provided; e.g., by deciduous trees or by other buildings.
The acceptability or otherwise of a design with substantial areas of south, east or west glass can be assessed with PHPP, using 25°C as the maximum comfort temperature and providing moveable summer-only shading if needed. PHPP contains weather data for Glasgow, Manchester, Birmingham, London and Plymouth and also many nearby weather stations in other countries. Use the geographically closest weather data for summer overheating calculations; e.g., for Milton Keynes, use London; for Worcester, use Birmingham; for Anglesey, use Dublin; for Dover, use Ostend. AECB will publish deemed-to-satisfy combinations for dwellings which are satisfactory for summer and winter performance without the need for further calculations.
Buildings which intend to use refrigerative space cooling systems, including reversible heat pumps, are not covered here. They must use the performance route to compliance.
19 The space heating system must be sized and designed to utilise circulating water at supply and return temperatures of ≤60/40°C under design conditions. So if the building has radiators or underfloor heating, these water temperatures would occasionally be reached in very cold weather. If the building is heated via the MVHR system, the water circulated through the plumbing coil(s) in the ductwork would occasionally reach these temperatures.
The reason for installing internal heat distribution systems which are capable of utilising low-grade heat and requiring central heating in blocks of flats is to preserve future fuel flexibility. The above temperatures have been mandatory since 1980 in Sweden and Denmark. For user comfort in buildings where heating is delivered via the MVHR system, the peak temperature of the supply air under design conditions must be ≤50°C.
It is assumed that the space heating system is operated continuously at least under severe weather conditions; i.e., with precise temperature controls but with no time controls. With Passivhaus or Gold, there may be no zone controls either, because temperatures within the thermal envelope tend to equalise. In fact, the cost of zone controls may be less effective - in p/kWh of energy saved - than spending the same budget on further improvements to the thermal envelope.
One argument against intermittent heating is that condensing boilers or heat pumps in a well-designed system are less efficient at full load; i.e., with a high return temperature, than at part load; i.e., with a low return temperature. Intermittent heating needs a larger heating system, costing money which could otherwise be spent on fabric insulation measures. The extra fuel consumption due to the reduced plant efficiency with intermittent heating could exceed the fuel saving arising from a slightly lower mean daily internal temperature.
For thermally-lightweight non-domestic buildings which are unoccupied for long periods, there may be net benefits to intermittent heating. But such buildings represent a small minority of all projects.
Sparsely-occupied buildings with a high surface/volume ratio; e.g., some detached houses, may need more heating power than the ventilation air alone can provide. If so, the usual solution is a coil in the ductwork plus a few strategically-sited radiators in living rooms, bathrooms and similar spaces, or radiators alone sited so that air movement caused by the MVHR system distributes the heat and so that living rooms and bathrooms are acceptably warm.
Single-room through-the-wall MVHR systems are very prone to short-circuiting and are not encouraged. However, even ducted whole-building MVHR systems can give short-circuiting if not designed with care. The supply and exhaust terminals must be laid out to avoid short-circuiting and avoid all risk of condensation and mould growth.
PHPP calculations allow for the presence of some solar gains even under design conditions. These are significant enough to supply a small percentage of a building's heat.
The standards do not permit the use of electric resistance space and water heating, as it cannot utilise low-grade energy resources. Heat pumps which are sized and designed to avoid use of electric resistance backup heat are accepted outside the gas supply area. Minor resistance heat backup for legionella control only is acceptable. The seasonal average COP for space and water heating combined must be ≥3.0, including the impact of the resistance heating with its effective COP of 1.0.
Within the gas supply area, CHP and district heating is a more flexible long-term option. It can utilise low-grade energy sources in the form of industrial waste heat, large-scale solar or geothermal wells, not just energy in the form of electricity. With present technology, 1 kWh of lowgrade heat from a medium to large gas-fired CHP plant - 100s of kW(t) to 100s of MW(t) - emits one-fifth to one-third as much CO2 as 1 kWh of heat from an electric heat pump. The performance version of the standards enables credit to be obtained for use of CHP systems.
20 Viessmann and other companies make storage tanks with insulation of 100 mm PU foam. These would meet Silver or Passivhaus. In case of problems sourcing storage tanks, one might build a larger enclosure than the bare tank, fill it with the necessary thickness of loose-fill insulation and rest the tank base on sufficient rigid insulation.
Treat 150 mm PU/PI foam with lambda ≤0.024 W/mK as equivalent to 240 mm expanded polystyrene or other loose-fill material with lambda ≤0.038 W/mK. Treat 100 mm PU foam as equivalent to 160 mm expanded polystyrene beads or similar loose-fill material.
21 Cooking with gas (LPG) typically emits 60-70 (50-60)% less CO2 than electric cooking.
Gas ovens today are unlabelled and data on running costs is limited. Energy efficiency requirements will be introduced when labels are introduced.
Induction hobs and/or A-rated electric ovens are allowed instead of gas or LPG in situations where a gas or LPG supply is considered unsafe or is illegal; e.g. blocks of flats. They are also allowed in buildings heated by CHP plant with annual outputs of ≥30% electricity, ≥55% heat (HCV) and heat distribution efficiency ≥90% - or equivalent parameters. If other projects wish to use electric cooking, they must follow the performance version of the standard and take account of the higher CO2 emission
22 Just as designers and builders must
ensure adequate performance of the insulation system, and the fixed
lighting, the occupants of a dwelling must fit energy-efficient table
and floor lamps and the occupants of an office or school must fit energy-efficient
background and task lighting. Otherwise buildings will consume more
energy than expected. If there is doubt that this will happen - there
may be for social housing - the designer must use the performance version
of the standard and presume that the occupants will fit standard inefficient
light sources; e.g., incandescent and/or halogen lamps. In these circumstances,
he/she might decide to compensate for this
worsening of energy performance by taking any or all of the following
steps:
(a) an improved thermal envelope;
(b) improved passive solar features;
(c) use of CHP, not gas for space and water heating and
(d) fitting a solar water heating system.
There are other options but these four are likely to be strong contenders to improve a building's performance.
The required efficacy in lm/W (Lumens/Watt) refers to the total lighting installation, including emergency and external lighting. Standby power used by lighting controls, etc must be included in the overall efficacy where applicable. Lighting in common or external areas of flats; e.g. unheated stairwells, must meet the same standard as lighting within individual units.
23 If the designer, builder or developer of housing provides and installs major appliances; e.g., refrigeration, washing machines and TVs, he/she must specify energy-efficient models. If the occupants choose the appliances, they must purchase energy-efficient models. If there is doubt over this, the designer must use the performance version of the standards and use input data which presumes that the occupants will fit appliances of normal UK energy efficiency. See note 22.
24 The top five TVs with a specific screen size on www.topten.ch are acceptable. There are three size classes, the smallest being <66 cm (<26 inch) and the largest being 90 cm (>36 inch). Any other models on the market with a lower or identical total consumption, relative to these five are acceptable. Large LCD screens often use 60% less electricity than plasma screens of the same size - typically, 140 W versus 350 W. However, the consumption of both types of screen varies widely.
The top five are defined as those with the lowest total electricity consumption in active and standby mode combined. Using the listed active and standby consumption, assume that a TV is in the active mode for 5 hours/day and the standby mode for 19 hours/day. So a model using 90 W in active mode and 3 W in standby uses (0.09x5)+(0.003x19) = 0.51 kWh/day.
26 Lifts are routinely used in offices
and high-rise flats. The UK Building Regulations now de facto require
them in non-domestic buildings of two storeys upwards. There is often
scope to save 50% or more of electricity consumption in low-rise buildings,
whose lifts tend to be particularly energy-inefficient. For Silver,
lifts installed must be from the top 50% of a supplier's range, measured
in terms of kWh/passenger journey. For Passivhaus, lifts installed must
be the most energy-efficient in a supplier's range. For Gold, lifts
installed must be the most energy-efficient models available from the
top two suppliers.
For their own health, occupants should be encouraged to use the stairs
whenever possible. So staircases must be accessible and welcoming. Lifts
in two- and three storey buildings must be readily accessible for use
by the disabled, but signs should indicate that they are not for regular
use by the able-bodied.
27 Small electrical appliances are defined as all other devices; e.g., including but not limited to vacuum cleaners, irons, toasters, mobile telephones, coffee makers, hi-fi systems, electric toothbrushes, electric lawnmowers and other garden machinery. Small appliances are normally all provided by the occupants of a building who must purchase electricity efficient models..
29 Of the total energy consumed by a building over a 100 year life, embodied energy appears to be 5-7% of the total for a building of current UK construction and 8-10% for a dwelling of Passivhaus construction. The rest is operational energy. This is based on central European-type construction of externally-insulated masonry or concrete walls, heavyweight partitions, concrete intermediate floors and timber roofs.
Some UK efforts to reduce embodied energy could increase a building's lifecycle energy usage. In particular, increasing its thermal capacity may raise its embodied energy but reduce its operational energy use for heating and for cooling. Proposals to regulate embodied energy would be counterproductive if they lead to buildings using more energy for space heating and/or cooling over their lifespan. We shall reassess this point once more work has been done to clarify the subject.
30 Clear instructions are required to the homeowner, tenant or non-domestic building owner for the setting-up and maintenance of MEV & MVHR systems and all other alterations to mechanical services. To be in accordance with CIBSE guidance on building logbooks. Provide English language version of the standard booklet on www.passiv.de, revised as needed for Silver and Gold.
Standard user manuals for low energy buildings will be published by the CarbonLite Programme later in its schedule.
31 Post-occupancy surveys and analysis of energy performance of non-domestic buildings are to be in accordance with documents published by William Bordass Associates and/or the Usable Buildings Trust. This guidance should be used to enable designers to establish whether deviations from the expected energy and CO2 benchmarks are due to lower or higher levels of energy efficiency, or are due to nonstandard occupancy conditions.
Downloads
• AECB CarbonLIte
Programme: Volume Three: The Energy Standards (AECB, 2007)
• Code for
Sustainable Homes, (Department for Communities and Local Government:
December 2006)
• Code
for Sustainable Homes - Technical Guide, ( Ibid, April 2008)
Disclaimer:
GreenSpec accepts no responsibility or liability for any damages or costs
of any type arising out of or in any way connected with your use of this
web site. Data and information is provided for information purposes only,
and is not intended for trading purposes. Neither GreenSpec nor any of
its partners shall be liable for any errors in the content, or for any
actions taken in reliance thereon.